Experience

Engineering experience demonstrated through real projects, practical solutions and measurable results.

Selected case studies from completed and ongoing projects show how Virium supports clients across Project Delivery, Sustainability, Interim Engineering and Business Performance.

Each case study focuses on the client requirement, Virium’s role and what is being achieved — from engineering design and sustainability improvements to operational performance and business value.

How Virium can help

SUSTAINABILITY
Industrial Energy & Utility Submetering

The site needed clearer visibility of electricity, gas, water and effluent use to identify avoidable operating costs.

Virium developed targeted submetering around significant energy users, benchmarking consumption against production to identify inefficient plant operation.

The resulting data informed practical operating actions and shutdown procedures, delivering measurable utility savings and supporting ongoing performance improvement.

£240k+
Annual utility cost saving
~33%
Reduction vs benchmark cost
Read Case Study →
Virium Submetering case study
PROJECT DELIVERY
Industrial Effluent Treatment Plant (DAF)

High-strength food-processing effluent was creating substantial sewer discharge costs linked to COD, suspended solids and discharge volume.

Following a successful DAF trial, Virium is engineering the permanent treatment solution—integrating flow balancing, DAF treatment, sludge management and supporting site infrastructure.

The project is designed to reduce pollutant loading, improve discharge performance and deliver projected net annual savings exceeding £100,000.

~95%
COD reduction in trial
£100k+
Projected annual net saving
Read Case Study →
PROJECT DELIVERY
Industrial Effluent Treatment Plant (DAF)

High-strength food-processing effluent was creating substantial sewer discharge costs linked to COD, suspended solids and discharge volume.

Following a successful DAF trial, Virium is engineering the permanent treatment solution—integrating flow balancing, DAF treatment, sludge management and supporting site infrastructure.

The project is designed to reduce pollutant loading, improve discharge performance and deliver projected net annual savings exceeding £100,000.

~95%
COD reduction in trial
£100k+
Projected annual net saving
Read Case Study →
Virium DAF case study